Representative illustration of an exhibition stand with installation equipment

Delivery proof · venue handover

Delivery is demonstrated, not assumed.

From approved artwork to the final case returned, the project maintains a clear record of what was prepared, checked and delivered, and what remains outstanding.

Representative illustration

One project record

Six evidence checkpoints across the exhibition lifecycle.

The evidence pack is tied to the specific event, stand number and approved scope. It does not replace venue instructions or the exhibitor’s acceptance.

01

Approved baseline

Final layout, dimensions, finishes, artwork versions, equipment list, agreed budget scope and named approver.

02

Production checks

Quality checkpoints, colour references, dimensions, functional tests and corrections before packing.

03

Packing & dispatch

Numbered cases, packing list, ownership, fragile items, vehicle, driver, departure time and venue access slot.

04

Onsite installation

Crew arrival, progress checkpoints, venue constraints, service connections, photographs and recorded blockers.

05

Exhibitor handover

Testing, cleaning, snag closure, equipment operation, deliverables and acceptance by an authorised person.

06

Dismantle & return

Dismantling slot, rental returns, damage records, storage inventory, disposal approvals and reuse recommendation.

Evidence standard

Every record answers five questions.

WhatThe panel, graphic, item, test, issue or deliverable being recorded.
WhereEvent, venue, hall, stand number and exact location within the scope.
WhenDate and time in relation to production lock, installation, opening or dismantling.
WhoWho created the record and who accepted the work or made the decision.
StatusAccepted, open snag, replaced, returned, stored or closed with a recorded reason.

Handover pack

What the exhibitor receives before the space opens.

  • Final viewWide and detailed photographs after cleaning and testing.
  • Operating notesScreens, lighting, audio, connectivity, remotes and daily start-up steps.
  • Open snagsAnything still pending, its impact, owner and committed resolution time.
  • ContactsNamed onsite escalation route for the event period.
  • Dismantling planAccess slot, exhibitor removals, rental returns and items marked for storage.
  • AcceptanceName, role, timestamp and any reservation recorded at handover.

Media boundary

Photographs support project delivery.

People, visitor data, badges, confidential screens and third-party material are not made public simply because they appear in a delivery record. Use in a portfolio, social post or case study requires separate, documented permission.

Private by default: the evidence pack is project material. Public use is limited to specifically selected assets and an approved purpose.

Start with a controlled scope

Provide the venue, dates and deliverables.

The exhibitor brief becomes the baseline for building the evidence pack.

Complete the brief