A stand can have many partners. Responsibility needs a clear map.

Print, AV, lighting, furniture, transport, venue services and onsite crews are connected through a clear scope, deadline, owner, acceptance check and fallback route.

Representative illustration

Control before order

Quotes can only be compared against the same scope.

01

Defined item

Dimensions, quantity, finish, performance, delivery point, installation requirements and return condition.

02

Comparable quote

Net price, VAT, transport, labour, overtime, venue fees, damage deposit and cancellation terms.

03

Named owner

One named person responsible for the order, artwork, delivery, onsite issues, acceptance and invoice matching.

04

Deadline chain

Approval, production, dispatch, venue access, testing and return dates tracked as separate checkpoints.

05

Acceptance proof

What is checked, who accepts it and what happens if the deliverable does not meet the agreed scope.

06

Fallback route

Backup stock, a second device, replacement print, an alternative crew or a documented no-go decision.

Supplier categories

Each category carries different risks.

CategoryPrimary controlsAcceptance
Graphics & printArtwork version, dimensions, substrate, colour reference, finishing and packing.Visual, dimensions and finish before dispatch.
AV & lightingModel, inputs, power, content format, rigging rules, operator and backup.Full playback and event-use test.
Furniture & rentalsQuantity, colour, condition, delivery slot, deposits and return ownership.Count and condition at handover and return.
TransportVehicle, driver, loading plan, passes, access window and contingency.Complete packing list at venue and return.
Onsite crewsNames, roles, arrival, venue induction, tools, supervisor and working limits.Completed assigned scope and clean closeout.
Venue servicesOfficial order, power, internet, water, lifting, waste and approved times.Service available and tested before opening.

Claims and checks

“Approved supplier” means only what the evidence supports.

  • IdentityLegal entity, invoice details, named contact and project role.
  • Venue eligibilityRequired access, insurance, licences or inductions checked for that venue and task.
  • CapabilityRelevant samples, equipment, capacity and committed dates, without invented certification claims.
  • Commercial termsWritten price, exclusions, payment milestones, cancellation and damage terms.
  • Data boundaryOnly necessary exhibitor, venue and access information is shared.
  • CloseoutInvoice matched to accepted scope, returns and documented adjustments.
Important: prior use does not automatically qualify a supplier for every venue, country, task or deadline. Checks are project-specific.

Escalation

When something changes, the right owner can decide quickly.

SIGNAL

Record the deviation

Item, time, evidence, current impact and supplier response.

OPTIONS

Set viable routes

Correct, replace, reduce scope, reschedule within venue limits or stop.

DECIDE

Name the approver

Cost, timing and visitor impact are accepted by the authorised decision owner.

Build the supplier map

Scope starts with the event and a clear set of requirements.

Provide the venue, footprint, dates and services so supplier packages can be organised properly.

Complete the brief